Valued Clients

Customer:

Consolidated Builders & Technology Resources Inc.
G-06B Regalia Towers 150 P TUAZON, QUEZON CITY

SMFI60TPH Cebu Feed Mill
Liquid Storage Tanks (Tank Farm)

Location: BMEG Plant Mandaue City, 11 Units Liquid Storage Tanks

  • 1 Unit Water Tank @ 210 cubic meters/210 tons
  • 6 units Oil Tank @ 210 cubic meters/ 265 tons
  • 3 units molases Tank @ 210 cubic meters/ 360 tons
  • 1 unit Diesel Tank @ 60 cubic meters

Tank Foundations

  • 22meters x 22meters with concrete pedestals and
  • Spill Containment and Band Wall

Tank Inside blasting with food-grade paint finish
Tank outside by power brush with epoxy enamel finish

Customer:

Consolidated Builders & Technology Resources Inc.
G-06B Regalia Towers 150 P TUAZON, QUEZON CITY

Project Start
1st Phase: Feb 2018 – June 2018    |    2nd Phase: Oct 2018 – Dec 2018

Installation:
Dec 2018 – Jan 2019   |    Square to Round Hoppers: 170pcs

SMFI 60TPH Cebu Feed Mill Project

Project Details:

Pipe Specification: 2.2M Diameter x 6mm thickness ASTM A 252
Total Pipe Length: 1164.5 meters

Pipe Cutting Lengths:

  • 21.5 meters x 20 units (On site splicing 11.5 + 10meters)
  • 14.5 meters x 17 units
  • 7 meters x 8 units
  • 10 meters x 4 units
  • 8 meters x 12 units
  • 13 meters x 20 units
  • 9 meters x 4 units

Attachments

Cone Sections: 85pcs with flanges
Top Cover with Grates: 85pcs
Pipe Painting: Inside Food Grade/ Outside Primer
3rd Party Inspection: 5% DPT

Customer:

CCLEX Project (Cebu 3rd Bridge)

Casing Pipe Splicing Works

Diameters (mm) : 2600; 2200; 2000; 1800 and 1500
Pipe Lengths: 16meters – 33meters
Pipe Thickness: 8mm to 20mm
Pipe Weight: Max 40Tons
Pipe Rotators: 20 tons and 40 tons Capacity
Welding Units: SMAW and GMA

Project Start
Project Start July 2019 – Feb 2020

TREVI Foundations Philippines
Unit 2301 23F/88 Corporate Center
141 Valero Corner Sedeno Streets, Salcedo Vill. Makati City

Customer:

Chrono Pipe Group Corp
Brgy. Sto. Nino, Carmen, Davao

Initial Pipe Project: Davao Bulk Water Supply

Project Start: Dec 2016
Initial Pipe Production: August 2019

CCLEX Project (Cebu 3rd Bridge)

Casing Pipe Splicing Works

Diameters (mm) : 2600; 2200; 2000; 1800 and 1500
Pipe Lengths: 16meters – 33meters
Pipe Thickness: 8mm to 20mm
Pipe Weight: Max 40Tons
Pipe Rotators: 20 tons and 40 tons Capacity
Welding Units: SMAW and GMA

Project Start
Project Start July 2019 – Feb 2020

Project: Spiral Pipe Mill Davao

Capacity: 20,000 tons/ Year
Pipe Specification: Diameter: 500 – 3000 diameter
Thickness: 4.5 – 25.4mm
Pipe Length: 6 – 30meters

Scope of Supply:

  • Coil Opener Unit
  • Coil Transfer Unit
  • Spiral Pipe Machine SRU 1600
  • Pipe Tilter – Inside Cleanout
  • Pipe Beveling Unit
  • Pipe Conveyor System
  • Pipe Repair Station
  • Pipe Expander
  • Pipe Hydrotester 1400 Tons
  • Pipe Carriages
  • Hydraulic Pipe Lowering System
  • Xray Station Pipe Handling System
  • Pipe Inside and Outside Painting unit

Customer:

Lattice Truss Fabrication

Scope: 80 KM Total length
Weld assembly of lattice truss
rebar’s by MIG weld
100% DPT

Customer:

Jehydro and Bio Energy Corporation

Project Start: August 2021
Initial Pipe Production: October 2021

CEBU MCWD Lahug, Lusaran Bulk Water Supply Project 2022

Pipe Specification:

Capacity: 230 Tons/
Diameter: 558mm Diameter
Thickness: 6.8 mm & 9mm Thickness
Meters: 24,000 Meters
Kilometer: 24 Km